top of page

LDSCHS Seniors Apartments | Lumby, BC

BCH, FCM, CMHA funded Development

Phase: Completed

Year: 2025

Value: $8 million

Units: 20

This 20-unit facility was completed in 2025 and has been designed for three different funding requirements. This means we developed a design that met different universal/accessibility requirements as well as different energy targets. The site is situated next to a creek so the design strategy included designing to flood plain levels as well as riparian setbacks. Solar arrays were installed on the roof of the building and each tenant can follow their own energy usage.

We provide regional design solutions that harmonize the needs of our clients with the communities we live in.
KAMLOOPS STUDIO

200 - 301 Victoria Street

Kamloops, BC | V2C 2A3

250 374 1112

KELOWNA STUDIO

100 - 1353 Ellis Street 

Kelowna, BC | V1Y 1Z9 

236 420 3550

VERNON STUDIO

3004  29th Street 

Vernon, BC | V1T 5A7 

778 506 4567

© BlueGreen Architecture Inc 2026

bottom of page